Question
A can complete 12% of the work in 15% of the allotted
time. A and B worked for the entire period of the allotted time and the work was completed on time. What portion of the work was done by B?Solution
Let the total time taken by them be 100 minutes. So, Ā 15% of 100 minutes = 15 minutes Now, 12% of work is completed in 15 minutes by A 4% of work is completed in 5Ā minutes by A 80% of work is completed in 100Ā minutes by A If A can complete 80% in 100 minutes, then, B will complete the remaining portion i.e. (100 - 80) = 20% ā“ Ā 20% of the work was done by B.
Which of the following groups is of pre-emergence herbicides?
Necrotic streak in flag leaf of wheat is due to the deficiency of:
Match List I with List II
Choose the correct answe...
Seedlessness in grapes is controlled by which genes?
The full form of UNCTAD is:
To reduce the soil damage what is optimum time for soil manipulation?
Which of the following insect orders contains species that are exclusively parasitic in behavior?
Where is the Head Quarter of the 'National Fisheries Development Board (NFDB)' located?
Which meteorological parameter is directly measured by using an open pan evaporimeter in the context of irrigation scheduling?
Soil structural units having horizontal axis much longer than vertical axis. Such type of soil structure is known as