      If 12 persons working 12 hours a day dig 12 meters of a

      tunnel in 12 days how many men are required to dig additional 4 meter of the tunnel (of the same dimension) given that they work 4 hours a day for 4 day?
      A 27 Correct Answer Incorrect Answer
      B 4 Correct Answer Incorrect Answer
      C 12 Correct Answer Incorrect Answer
      D 36 Correct Answer Incorrect Answer

      Solution

      ATQ, Let the number of men required be x (12 × 12 × 12)/12 = (x × 4 × 4)/4 ⇒ x = 36  ∴ Number of men required be 36