Question
Anil works 3 times faster than Sandeep. If Sandeep can
complete a work independently in 12 days, the number of days in which Anil and Sandeep can together finish the work is:Solution
The correct answer is D
The time period of a second’s pendulum is –
Which lens is used to correct myopia (shortsightedness)? Â
Which phenomenon does a hologram use to create an image?
Which of the following vitamins are called fat-soluble vitamins?
What is the speed of sound in air at room temperature (20°C)? Â
The force of attraction between two masses is called — Â
The experimental evidence that the electron exhibits wave-like characteristics was first provided by:
A body explodes into three equal fragments, two of which fly off perpendicular to each other with equal speeds. What is the direction of the third frag...
The Pointing vector of electromagnetic waves has the same dimensions as that of:
When a cannonball is fired, its motion is an example of ______.