Question
A, B and C can do a work separately in 18, 36 and 54
days, respectively. They started the work together, but Band C left 5 days and 10 days, respectively, before the completion of the work. In how many days was the work finished?Solution
The correct answer is D
Two schools, A and B participate in a Quiz competition. The probability of A’s winning is 3/7 and the probability of B’s winning is 3/5. Wha...
A bag contains 4 white balls, 9 red balls, and 5 green balls. Two balls are drawn at random. Find the probability that the two balls are red.
There are (m + 7) red roses, (m + 11) white roses and βmβ pink roses in a bag. If the probability of picking a pink rose is 5/18, then find the valu...
Two dice are rolled together. Find the probability that the sum of the numbers on the two dice is less than 4.
If a coin is tossed 10 times then what is the probability of getting three heads?
Bag C contains 2 red balls and 2 blue balls, whereas bag D contains 5 red balls and 5 blue balls. One ball is drawn at random from C and transferred in...
A bag contains 7 blue balls, 3 red balls, and the rest are black balls. The probability of drawing a black ball from the bag is 4/9. How many black ball...
In a box there are 8 red, 7 blue, and 6 green balls. One ball is picked up randomly. What is the probability that it is neither red nor green?
- The ratio of green to yellow balls in a basket is 5:7. If 15 balls of each color are added, the ratio becomes 2:3. How many yellow balls were originally th...
A bag contains 7 green balls, 5 blue balls, and 10 yellow balls. A box contains 3 green balls and 8 yellow balls. A ball is randomly drawn from the box ...