Question
A room 8 m long, 6 m broad and 4m high has 2 windows of
2( 1/2) m m and 1m and a door of 2m 2(1/2) m. Find the cost of papering the walls with paper 50cm wide at the rate of 1.50 paise per metre?Solution
Surface area of four walls = 2(L + B) H                       = 2 (8 + 6)*  4                       = 112 m2 Area of 2 windows = 2 *3/2 = 3 m2 Area of door = 2 *5/2 = 5 m2 Wall paper to be papered = 112 – 3 – 5 = 104 m2 Paper = 50cm =
 m Area of the papered = L* B 104 = L
Â
 L = 208 m
Cost= 208Â * 1.50 = Rs 312
18 men, working 8 hours a day, can complete a task in 21 days. If a woman is 33(1/3)% less efficient than a man, how much time will it take for 24 women...
Shivam and Harish can do a job alone in 90 days and 120 days respectively. Both work together and earn Rs. 5,250. Find Shivam’s earnings.
A2 type ‘P’ pipes can fill a tank in 450 hours, while B2 type ‘Q’ pipes can fill the same tank in 6...
‘A’ and ‘C’ together can dig a hole in 8 hours while ‘A’, ‘B’ and ‘C’ together can dig the same hole in 6 hours. Find the time taken...
A and B can complete a work together in 24 days. If A alone can complete one-fourth of the work in ‘x’ days and remaining work is completed ...
P alone can finish a piece of work ‘M’ in 6 days while Q takes 3 days to finish it alone. P, Q and R working together can finish the work ‘N’ wh...
Pawan, Bittu, and Raju can individually complete a task in 36 days, 60 days, and 30 days, respectively. They all begin working together, but Raju stops ...
- A man can complete a job alone in 20 days. A woman can complete half of the same job in 15 days. If both work together, how many days will it take them to ...
A takes twice as much time as B and thrice as much time as C to finalize a task. Working together, they can complete the task in 8 days. The time (in da...
- ‘A’ can complete a job in 36 days. ‘B’ takes 3 times as long as ‘A’ to finish the same job. If both work together, how much of the work will th...