Question
A room 8 m long, 6 m broad and 4m high has 2 windows of
2( 1/2) m m and 1m and a door of 2m 2(1/2) m. Find the cost of papering the walls with paper 50cm wide at the rate of 1.50 paise per metre?Solution
Surface area of four walls = 2(L + B) H                       = 2 (8 + 6)*  4                       = 112 m2 Area of 2 windows = 2 *3/2 = 3 m2 Area of door = 2 *5/2 = 5 m2 Wall paper to be papered = 112 – 3 – 5 = 104 m2 Paper = 50cm =
 m Area of the papered = L* B 104 = L
Â
 L = 208 m
Cost= 208Â * 1.50 = Rs 312
‘A’ and ‘B’ together can complete a work in 12 days, while ‘B’ and ‘C’ together can complete the work in...
‘M’ and ‘N’ together can finish a piece of work in 22 days. If ‘M’ alone can complete it in 55 days, how many days will ‘N’ alone take?<...
40 men can complete a piece of work in 48 days. ‘x’ men started the work and after 33 days 64 more men joined them so that whole work was finished i...
Person A can complete a certain task in 20 days, while person B can finish the same task in x days. Together, they can complete the task in 12 days. Det...
The efficiency of A, B, C, D are in the ratio of 6 : 5 : 4 : 3. If A and C can do a work together in 6 days. Then How much days B and D will take to com...
A, B and C together can do a work in p/13 days, A and B together can do the work in p/10 days and B alone can do the work in p/4 days. If C takes 20 day...
Pawan, Bittu, and Raju can individually complete a task in 36 days, 60 days, and 30 days, respectively. They all begin working together, but Raju stops ...
The time taken by P to complete a task is half of the time taken by Q. Q and R working together finish the task in 20 days, while...
A and B together can complete a piece of work in 30 days while A alone can complete 50% of the work in 25 days. Find the time taken by B to compl...
P and Q individually can complete the work in 36 days and 54 days respectively. If the time taken by R alone to complete the work is 1.25 times the time...