Start learning 50% faster. Sign in now
Total work done by C in 10 days = 10 × 5 × 4 = 200 units. Total work done by D in 10 days = 10 × 7 × 2.5 = 175 units. Total work by C and D = 200 + 175 = 375 units.
The process of gaining electrons is known as:
A bullet is fired from a rifle which recoils after firing. The ratio of kinetic energy of the rifle to that of the bullet is –
The atomic bomb is based on which principle?
Which of the following relation is correct?
Which of the following substances will turn red litmus paper blue?
Which of the following is used as a moderator in nuclear reactors?
Consider the following statements. Hypermetropia is a defect of vision in which:
Which element gives hardness to stainless steel?
Bleaching Powder is a compound of _______?
Which of the following element is used for the manufacture of the safety-matches?