Question
Tato-I Hydro Electric Project is located in which
state?Solution
The Cabinet of Economic Affairs led by Prime Minister Narendra Modi has approved the Tato-I Hydro Electric Project (HEP) with an investment of Rs 17.5 billion. This hydropower project will be located in Shi Yomi district of Arunachal Pradesh. The initiative aims to boost the energy infrastructure of the region.
The speed ratio of Y and Z is 5 : 4. If Y increases his speed by 25%, he can cover 300 km in 4 hours. How long will Z take to travel 192 km?
‘A’ and ‘B’ started moving towards each other at same time with a speed of 26 km/hr and 13 km/hr, respectively. If the di...
βAβ and βBβ started moving towards each other at same time with a speed of 26 km/hr and 13 km/hr, respectively. If the distance covered by βAοΏ½...
Pratham is traveling from Delhi to Banthara, a distance of 382 km. She starts her journey from Delhi at a speed of 120 km/h, and her speed decreases by ...
Train A is 180 meters long, while another Train B is 240 meter long. Train A has a speed of 30 kmph and Train B’s speed is 40 kmph, if the trains ...
Suniti goes to gym at a speed of 3 km/hr and returns back at a speed of 5 km/hr. If she takes 8 hrs in all. Find the distance between her home and gym.
Train P starts from Lucknow to Dehradun at 11:55 am with an average speed of 25 m/s. Train Q starts from Dehradun to Lucknow at 1:35 pm with an average ...
A policeman saw a thief from a distance of 450 m. When the policeman started chasing him, the thief also started running. The ratio of speeds of the th...
Car A departs from Varanasi towards Lucknow at 8:00 AM, traveling at a speed of 48 km/h. Car B starts from Lucknow towards Varanasi at 9:15 AM, with a s...
The distance between Rahul's house and the gym is 60 km. When travelling at ___ km/h, Rahul reaches the gym at his usual time. However, when he reduces ...