Question
Rishikesh Karanprayag rail line was in discussion
recently, what will be the total length of this rail line?Solution
Rishikesh-Karnprayag Rail Project: The new broad gauge (1676 mm) rail line between Rishikesh and Karnaprayag is a very important development project in the state of Uttarakhand. The proposed railway line will connect 5 important cities like Devprayag, Srinagar, Gauchar and Karnaprayag. The length of this project with a project cost of Rs 16216 crore is 125.20 km, in which 104 km of railway line will be underground. 18 bridges and 17 tunnels are to be constructed under the project. The construction work of bridges and tunnels is being done at a fast pace.
Which type of rocks is most likely to contain fossils?
Match List-I (Sphere/Domain) with List-II (Person) and choose the correct answer from the codes given below:
Which new category has been introduced under the Pradhan Mantri Mudra Yojana to cover loans between ₹10 lakh and ₹20 lakh?
Which of the following is NOT an example of Fixed Capital?
Rajasthan state formation diwas is celebrated every year on?
Who was ranked as the top central banker globally for the second consecutive year by Global Finance magazine in 2024?
An arrangement between GOI and RBI to mop up the excess liquidity generated on account of higher capital inflows is called –
Who has won gold medal in Commonwealth Wrestling Championship held in South Africa
NHIDCL signed an agreement with IL&FS for Zojila tunnel project, which will be the longest bi-directional tunnel of Asia. This tunnel is in the state of:
Which state government recently declared a heatwave as a State-specific disaster?