Question
Rishikesh Karanprayag rail line was in discussion
recently, what will be the total length of this rail line?Solution
Rishikesh-Karnprayag Rail Project: The new broad gauge (1676 mm) rail line between Rishikesh and Karnaprayag is a very important development project in the state of Uttarakhand. The proposed railway line will connect 5 important cities like Devprayag, Srinagar, Gauchar and Karnaprayag. The length of this project with a project cost of Rs 16216 crore is 125.20 km, in which 104 km of railway line will be underground. 18 bridges and 17 tunnels are to be constructed under the project. The construction work of bridges and tunnels is being done at a fast pace.
 Tag colour of foundation seed is
Which class of seed is exempted from certification?
The method for producing fish seed in which all the nuclear genetic information originates from sperm while mmitochondrail DNA is still maternally deriv...
Seed stratification is done in apples at ___°C for 60-90 days.
Minimum isolation distance for the production of foundation seed of rice is
National Seed Corporation was established in
ICAR- Central Institute of Cotton Research is located at ___
Dockage is
Which of the following is the progeny of breeder seed and is responsible for producing certified seed?
Seeds are formed but the embryos develop without fertilization in