Question
What is the overall capacity of the Srinagar
Hydroelectric Project?Solution
Srinagar Project Dam RiverAlakhnanda LocationVishnuprayag Its installed capacity is 330 MW (4x82.5 MW).
In a division sum, the divisor is 12 times the quotient and also 5 times of the remainder. If the remainder is 48, then the dividend is:
What is the average of first 32 multiples of 3.2?
What least number must be added to 6834 to get a number exactly divisible by 18?
- Find the largest value of 'k' such that the number '29k654' is divisible by 3.
In a factory of 50 labours, if the two labours left the job whose wages were 1120 and 1340 and two new labours join the factory which results in decreas...
The sum of (p/q)+(q/r)+(r/s)+(s/t) = (239/60). The value of βqβ is one less than the value of βsβ. The average of βpβ and βsβ is 4. The ...
- A number divided by 84 leaves a remainder of 25. What will be the remainder if this number is divided by 12?

In an examination, the number of those who have passed and the number of those who failed were in the ratio of 40 : 7. If 7 more had appeared and the nu...
What is the value of 1² + 3² + 5² + 7² + 9² ................ 19²?