Get Started with ixamBee
Start learning 50% faster. Sign in now
The power plant is located at Bagerhat district of Bangladesh, with a capacity of 1320 (2×660) MW coal-fired power plant is being set up at a cost of approximately $2 billion. It is being developed under India’s concessional financing scheme and will add 1320 MW to Bangladesh’s national grid. It’s unit ii will be operational next year.
∛21952 × 44 = ? × 14
[1.45 X 1.45 X 1.45 + 0.55 X 0.55 X 0.55 + 4.785] = ?
464 + 181 +? = (154 × 25) - (15) 2
(360 - ?)/(25% of 96) = 13
(25 + 12) x 6 + 34 = ? + 18
16 × 14 + 30 × 21 = 14 × ?
√ (122 + ? + 65) = 14
12.5% of (100 + ?) = 40