Question
Which of the following method often used in public
projects, in which an interested party initiates a proposal for a contract or the bid for a project –Solution
A Swiss Challenge is a method of bidding, often used in public projects, in which an interested party initiates a proposal for a contract or the bid for a project. The government then puts the details of the project out in the public and invites proposals from others interested in executing it. On the receipt of these bids, the original contractor gets an opportunity to match the best bid.
A right triangular pyramid XYZB is cut from cube as shown in figure. The side of cube is 16 cm. X. Y and Z are mid points of the edges of the cube. What...
What will be inradius of an equilateral triangle of side 4 cm?
In the given figure, radius of a circle is 14 √2 cm. PQRS is a square. EFGH, ABCD, WXYZ and LMNO are four identical squares. What is the total area (i...
In the figure P is a point which is 12 cm away from the centre of the circle O. A line drawn from P point cuts circle at point A and B respectively. If...
If in a ΔABC, AD is internal angle bisector & D is a point on BC, AB = 6cm, BC = 9cm then what is BD:CD?
The lengths of three medians in a triangles are 6 cm, 8 cm, 10 cm. What is the area of that traingle (in cm 2 )?
In the given figure. ‘O' is the centre of the circle and ∠BCA = 50°. The value of ∠BDA is:
In the figure given below, PQ is parallel to RS. What is