Question
What is the expected completion deadline for a section
of the Varanasi Ropeway Project?Solution
August 2024, as the section linking Varanasi Cantonment Railway Station to Rath Yatra is set to be completed by August 2024.
If step III of a given input be ‘high concentration of bone marrow derived cartilage stem’, what would be the input?
What is the difference between the third element from the right in step IV and the fourth element from the left in step III?
How many steps are required to complete the given arrangement?
If the entry code of Batch C on Tuesday (2nd May, 2017) was “the user can also over ride bionic hand control", then what was the entry ...
Which of the following elements is third to the left of the 10th element from the left in Step III?
Step II of an input is: Warehouse 57 birth cat 34 41 Silent 22, which of the following steps will be last?
Given the input, what would be the step IV of the input?
Input: “this is the first study from where any”
Which element is third to the left of second element from the right end in step IV?
How many elements are there between β03β and β45β in step-II?
What is the 18th step for the following input?
Input: the Indian team on tour with headed Rahane
...