Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in nowGandak Project (Gandak Pariyojana) is a joint project of Bihar, Uttar Pradesh and Nepal.
What is the purpose of Rail Green Points (RGP) introduced by Indian Railways?
The average annual growth rate of capital for Indian Railways was ______ between 1860 and 1939.
How many route kilometres of Indian Railways are electrified as per the data till 2024?
National Academy of Indian Railways is situated at:
Founded in 1950, one of the industrial units owned by Indian Railways is named after the Indian freedom fighter:
The first passenger train that ran between Boribunder and Thane, covered a distance of:
Which system manages freight operations in Indian Railways?
During 2015 - 16, Indian Railways completed the electrification of _____ km.
As on 31 March 2011, the total route length of the broad gauge of the Indian Railways was: