Question
A completes a work in 15 days, B completes the same work
in 8 days while B and C jointly complete the same work in 4 days. If A and C jointly complete the same work in x days while A and B jointly complete it in y days, what is the value of x/y ?Solution
Given: A completes work in 15 days → Work per day = 1/15 B completes work in 8 days → Work per day = 1/8 B & C together complete work in 4 days → Work per day = 1/4 C's Work per Day    A + C’s Work per Day  
  LCM of 15 and 8 = 120 :  
 So, A + C complete work in: x = 120/23 A + B’s Work per Day  
 So, A + B complete work in : y = 120/23 To find (x/y)  
The temperatures used for canning foods ranges from ____________________
Match the following mineral metabolism & their Disorders A to D
1. Phosphorus metabolism A. Osteomalacia & Rickets
...
Which of the following is/are the structural polysaccharide?
a. Chitin
b. Cellulose
c. glycog...
The microwave frequency used in food industry is:
In canning large fish, the procedure when gut and head is removed is called:
In cryogenic freezing the liquid nitrogen temperature is:
Fats are solid at room temp. due to the presence of ……Fatty acids
Bacterial cells show their greatest resistance to heat during
The hydrolysis of fats and oils produces
Lipids with a benzene ring structure are called: