Question
A completes a work in 15 days, B completes the same work
in 8 days while B and C jointly complete the same work in 4 days. If A and C jointly complete the same work in x days while A and B jointly complete it in y days, what is the value of x/y ?Solution
Given: A completes work in 15 days → Work per day = 1/15 B completes work in 8 days → Work per day = 1/8 B & C together complete work in 4 days → Work per day = 1/4 C's Work per Day  A + C’s Work per DayÂ
 LCM of 15 and 8 = 120 :Â
So, A + C complete work in: x = 120/23 A + B’s Work per DayÂ
So, A + B complete work in : y = 120/23 To find (x/y)Â
A bag contains 7 yellow balls, 5 black balls and 3 red balls. Two balls are drawn simultaneously. Find the probability that both the balls are of same ...
- Three persons i.e. ‘M’, ‘N’ and ‘O’, are given the same puzzle to solve. The probability that ‘M’, ‘N’ and ‘O’ will solve the puzzl...
A bag contains 4 orange balls, 5 black balls, and 6 pink balls. If 3 balls are taken out randomly, what is the probability that all the three balls
A bag holds 12 pink balls and 13 white balls. If two balls are randomly drawn from the bag, what is the probability that the two balls are of different ...
- Find the probability of selecting a King or a Jack from a well shuffled deck of cards.
A box contains 5 red, 4 blue, and 6 green balls. Two balls are drawn at random. What is the probability that both balls are green?
In a group of artists, there are 10 dancers and 8 singers. If four artists are to be selected at random, what is the probability that 2 dancers and 2 si...
what is the probability that at least one of them narrates an incident truthfully.
Three cards are drawn one after another with replacements from a pack of cards. What is the probability of getting the first card a Jack, the second car...
- Find the probability of selecting a heart or a diamond card from a well shuffled deck.