A work can be completed by ‘A’ and ‘B’, alone in 15 days and 10 days, respectively. Find the number of days taken by ‘C’ to complete the same work alone if ‘A’, ‘B’ and ‘C’ together can complete the whole work in 4 days.
Let total work = 30 units (LCM of 15 and 10) Efficiency of ‘A’ = (30/15) = 2 units/day Efficiency of ‘B’ = (30/10) = 3 units/day Combined efficiency of ‘A’, ‘B’ and ‘C’ = (30/4) = 7.5 units/day Efficiency of ‘C’ = 7.5 – (2 + 3) = 2.5 units/day Required time taken = (30/2.5) = 12 days
What is the role of a device driver in an operating system?
Which logic gate produces an output that is the logical sum of two or more inputs?
Which of the following is an example of a software development methodology?
A field is part of a record and contains a single piece of data for the subject of the record.
In a B+ tree, the leaf nodes are typically connected in a linked list to facilitate:
Why probe packets are transmitted in the network
What are the three main dimensions of big data known as the "3Vs"?
How to get first line from a file ?
Which of the following is/are Network Audit Tools/Software
Which component allows current to flow in one direction and blocks it in the opposite direction?