A work can be completed by ‘A’ and ‘B’, alone in 20 days and 15 days, respectively. Find the number of days taken by ‘C’ to complete the same work alone if ‘A’, ‘B’ and ‘C’ together can complete the whole work in 5 days.
Let total work = 60 units (LCM of 20 and 15) Efficiency of ‘A’ = (60/20) = 3 units/day Efficiency of ‘B’ = (60/15) = 4 units/day Combined efficiency of ‘A’, ‘B’ and ‘C’ = (60/5) = 12 units/day Efficiency of ‘C’ = 12 – (3 + 4) = 5 units/day Required time taken = (60/5) = 12 days
_____ is commonly used method of flood control
In the composition of soil on volume basis soil water and soil air comprises 50%. What is the percent of mineral matter?
After China, India is the world’s second-largest aquaculture nation and the ____________ producer of fish overall.
The term used to define the variation derived from any form of the cell or tissue culture is known as __________
Who write the book 'I Too Had a Dream'?
What is the name for the multicellular structures formed by bacterial layers encased in an exopolymeric matrix on root surfaces?
The symbol 'D' in thermo-bacteriology is indicated for
TFS stands for
The capital that is consumed by an economy or a firm in the production process is known as
Which of the following is a common type of nitrogen-fixing bacteria that forms a symbiotic relationship with leguminous plants?