P alone can finish a piece of work ‘M’ in 9 days while Q takes 3 days to finish it alone. P, Q and R working together can finish the work ‘N’ which is 12 times of work ‘M’ in 9 days. How long will R take to finish work ‘N’, when working alone?
Let the work ‘M’ = 9 units (LCM of 9 and 3) Efficiency of P = 9/9 = 1 units Efficiency of Q = 9/3 = 3 units Efficiency of P, Q and R = (9 × 12)/9 = 12 units per day Efficiency of R = 12 – (1 + 3) = 8 units per day Time taken by R to finish work ‘N’ = 108/8 = 13.5 days
A cylindrical tank of 28 cm base radius is partly filled with water. How many spherical iron balls of 1cm radius are added in it in order to increase th...
In triangle ABC, the bisector of angle BAC cuts the side BC at D. If AB = 10 cm, and AC = 14 cm then what is BD : BC ?
The circumference of two circles are 132 cm and 88 cm respectively. What is the difference between the area of the larger circle and the smaller circle?
Number p is 15% more than 150. If k is 15% less than p, then k is equal to:
In a rectangle, the ratio of length and breadth is 3:2 and its perimeter is 240 cm, then what the area of the rectangle?
The circumference of a circle is 33 cm and the length of the rectangle is 8 times the radius of the circle. Find the area (in cm2) of the rec...
In a rectangular floor of length and breadth of 13 metres and 10 metres, respectively, square tiles each of 5 metre edge length are to be laid. If the c...
The surface area of water in a swimming pool forms a rectangle with length 30m and breadth 12m. The depth of water increases uniformly from 1.4m to 2.6m...
If the length of the diagonal of a square is 4.8 cm, then the area of the square is:
In a right-angled triangle PQR, right-angled at Q, the length of the side PR is 17 units, length of the base QR is 8 units, and length of the side PQ i...