Rajasthan Renewable Energy Corporation Ltd (RRECL) commissioned the country’s first farm-based solar power project under the Kusum scheme in Kotputli having 1 megawatt capacity spread over on 3.5 acre semi-barren land. It is also the first of 623 farm-based solar projects selected by RRECL for generating 722 MW capacity in the state under the first phase of Pradhan Mantri Kisan Urja Suraksha evem Utthan Mahabhiyan (Kusum) scheme.
Which of the following mechanisms do not encourage cross pollination?
The average dry matter requirement of desi cow is ____ during dry period and ____ during lactating period.
The branch of Horticulture that deals with the cultivation of vegetables is called
The recently formed order with little profile development is termed as ………………………..
The application of organic manures in the soil helps in/tends to:
Thalamus of hypogynous ovary is
Tristeza virus is associated with .....
Tomato damping off is caused due to ____
Loose smut of wheat is caused by
What is the major symptom of damage caused by the Whitefly, Bemisia tabaci, on its host plants?