Question
What is the total financial outlay of the Modified Command
Area Development and Water Management (M-CADWM) sub-scheme?Solution
The M-CADWM sub-scheme under PMKSY has a total outlay of ₹1,600 crore.
Which instrument is used to measure electric current? Â
The emission of a beta-minus particle from a nucleus results in:
A conducting rod of length 0.2 m is rotated with angular velocity 10 rad/s about one end in a uniform magnetic field of 0.5 T perpendicular to the plane...
The intensity of any wave is proportional to which quantity?
The wavelength produced by a He-Ne laser corresponds to the transition in:
The material which can be deformed permanently by heat and pressure is called a:
What does 'IC' stand for in electronics?
Which of the following gas is used in the manufacture of Vanaspati Ghee?Â
The ratio of the total distance traveled by a body to the total time taken is its:
Water flows in a horizontal pipe of non-uniform area of cross-section at a pressure difference of 1.6 cm of mercury. If the velocity of water at the la...