Start learning 50% faster. Sign in now
With the successful commissioning of entire capacities of 150 MW & 90 MW Devikot Solar PV Projects at Jaisalmer, Rajasthan, are declared on Commercial Operation w.e.f. 00:00 Hrs. of 13.12.2022.
How many molecules of ATP are generated directly through substrate-level phosphorylation in one turn of the citric acid cycle?
Which of the following Traceability system is offered by APEDA for Organic Products?
choose the correct option
Statement I: Sodic soils cannot be reclaimed with hydrotechincal method of reclamation
Statement II: Hydro techn...
The organization responsible for formulating Indian Standards for fresh and processed fish is:
Seed rate required for Pearl millet is:
Identify the scheme which consolidate the existing rural road network by upgradation of existing ‘Through Routes’ and ‘Major Rural Lin...
Lumpi-Pro VacInd, a vaccine for Lumpy disease of cattle has been developed by ____
How much area is covered under micro watershed?
Given below are two statements:
Statement I
A heat unit is the departure from the mean daily temperature below the maximum temperatur...
A market in which the purchase and sale of a commodity takes place at time ‘t’ but the exchange of commodity takes place on some specified date in f...