Question
________ company has won a contract to build a 300
megawatt (MW) coal fired power plant in Botswana(South Africa).Solution
India’s Jindal Steel & Power Ltd has won the bidding of the construction of 300 megawatt (MW) coal fired power plant in Botswana.
Some equations are solved based on a certain system. On the same basis find out the correct answer for the unsolved equation. Â
8 – 4 – 2�...
Identify the number, which when added to itself 17 times gives 756.
Select the option that is related to the third term in the same way as the second term is related to the first term.
PLANK : KOYMP:: SHIRT : ?
Study the given pattern carefully and select the number that can replace the question mark (?) in it.
(8, 4, 94)
(4, 9, 106)
(12, 1...
Select the option that is related to the third letter-cluster in the same way as the second letter-cluster is related to the first letter cluster.
...Select the option that is related to the third number in the same way as the second number is related to the first number.
42 : 1769 :: 34 : ?
6 : 222:: 7 : ?
Select the set in which the numbers are NOT related in the same way as are the numbers of the following set. (NOTE: Operations should be performed on th...
Select the option that is related to the third term in the same way as the second term is related to the first term.
CFHJO: DHKNT:: NVODI: ?
Select the related number from the given alternatives:
8 : ? :: 7 : 344