Taragiri, the third stealth frigate of the Project 17A, was launched by Mazagon Dock Shipbuilders Ltd . ( MDL ). The ship has been built using integrated construction methodology which involves hull blocks construction in different geographical locations and integration / erection on slipway at MDL . The keel of Taragiri was laid on September 10, 2020, and the ship is expected to be delivered by August 2025 . The estimated cost of Project 17A is around ₹25,700 crore . The first ship of Project 17A, Nilgiri, was launched on September 28, 2019, and is expected to begin sea trials in the first half of 2024 . The second ship of P17A class Udaygiri was launched on May 17 this year and is expected to start the sea trials during the second half of 2024 . The keel of the fourth and the final ship was laid on June 28 .
The number of Pawn in chess is______.
Consider the following statements :
Statement I:
In India, the RTGS and NEFT payment systems are owned and operated by National Payme...
What term describes the legal obligation of veterinarians to ensure animal welfare? Â
The first general election of Lok Sabha was held in the year:
 As per the National Family and Health Survey (NFHS), 5th report the number of women were more than the number of men, what was the number o...
The scientific study of rocks is called as
Which of the following partnered with Israel based ISMC Analog Fab Pvt Limited to start semi conductor plant? Â
The Olympic Winter Games 2026 would be played in_______.
___________ is the only State of India where the Sangai deer is found.
Consider the following statements:
I. India’s overall (merchandise plus services) exports increased from USD 52.8 billion in June 2021 to U...