Question
In Process A of a manufacturing unit, 1,000 units were
introduced during the period. By the end of the month, 800 units were completed and transferred to the next process. The closing work-in-progress consisted of 200 units, which were 100% complete with respect to materials and 50% complete with respect to labour and overheads. Using the weighted average method, the number of equivalent units for labour and overheads will be:Solution
Equivalent Units = = 800 + (200 * 50%) = 800 + 100 = 900
If tanθ + secθ = 5, find the value of sinθ.
What is the value of [(sin x + sin y) (sin x – sin y)]/[(cosx + cosy) (cosy – cosx)]?
What is the simplified value of the given expression?
3(sin² 30° + sin² 60°) + 6sin 45° - (3sec 60° + cot 45°)
Find the value of the given trigonometric expression:
(sin 10°cos 80° + cos²10°) × sin 30° + (cos 60°tan 45°) × sec 60°
...- If sin 2a = (3/4), then find the value of (sin a + cos a).
If √3 tan x = 3, then the value of x:
If sec x + tan x = 11 then find secx?
If cos 2A = 1, then find cos A
If sec A + tan A = 7 and sec A - tan A = (1/7), find the value of cos A.
- If cos2B = sin(1.5B - 36 o ) , then find the measure of 'B'.