Question
Which of the following is an example of a semi-variable
cost?Solution
A semi-variable cost has both a fixed and a variable component. The minimum connection charge for the electricity bill is the fixed portion, while the charge based on consumption is the variable portion. T herefore, it changes partly with activity level and partly remains constant making it a semi-variable cost. Note –
- Rent cost is fixed
- Direct material is variable
- Salary) is fixed cost
- Commission per unit is a variable cost
The octal number system consists of the following symbols:
S/MIME in Internet technology stands for
Which layer of the OSI model deals with transmission of raw bits?
Which of the following is used to align text to the center in MS Word?
Three bits used To control access the in UNIX are represented by :
In the hexadecimal number system, which symbols are used to represent values greater than 9?
What is the core function of a "Server" in computer networks?
What is system software?
What technology does a "Solid-State Drive (SSD)" use for data storage?
Which technology connects smart physical devices with sensors to the Internet?