Question
If equation is over-identified which method is used to
estimate?Solution
Advanced techniques, such as generalized method of moments (GMM) and two-stage least squares (2SLS), can be used in over-identified regressions. The selection of the appropriate method should be based on the characteristics of the data and the specific econometric considerations. Â
An athlete can jump farther by running before jumping due to which type of inertia?
Which part of a plant is responsible for photosynthesis? Â
A pond of water appears less deep due to –
If the vector sum of torques acting on a system is zero, then the object is in:
Find the resistance when a current of 2 A flows under a voltage of 10 V. Â
Which of the following materials is most suitable for marking electromagnetic and core of transformer?
Ultrasonic waves, propagating through a medium, can be detected by:
Compared to fresh Water, the freezing point of sea water is -
A rubber ball is dropped from a height of 2 metres. To what height will it rise if there is no loss of energy/velocity after rebounding?
A uniform wire is bent into a circle and a battery is connected across a chord that subtends an angle of 60° at the center. What is the ratio of curren...