Question
A and B can do job in 6 days. B and C can do same job in
12 days. A, B and C together can do same job in 4 days. In how many days A and C together can complete the job?Solution
Total work = Number of days × 1 day’s work (efficiency) Total work = LCM (6, 12, 4) = 12 unit 1 day’s work of (A+B) = 12/6 = 2 unit 1 day’s work of (B + C) = 12/12 = 1 unit 1 day’s work of (A + B + C) = 12/4 = 3 unit Now, 1 day’s work of A = 3 – 1 = 2 1 day’s work of C = 3 – 2 = 1 1 day’s work of A and C = 2 + 1 = 3 A and C together can complete the job in = 12/3 = 4 days
The function of MPEDA include:
The agriculture growth rate target fixed by the Planning Commission during 11th plan of India is
"Central Sheep and Wool Research Institute" is located at -
_________is the first organ to emerge from the seed.
All the following curves are U shaped except
Heat exchanger used for pasteurization of milk is/are
Which of the following is best suited as catch crop?
What does the term "percolation" refer to in relation to water movement in soil?
The properties of soil which determine the water movement and root penetration
The minimum tillage, wherein primary tillage is completely avoided and secondary tillage is restricted to seedbed preparation in the row zone only, is: