Which type of budget is prepared for a range of activity
levels rather than a single level?Solution
A Flexible Budget is designed to change or flex with the level of activity. It is prepared for a range of capacities (e.g., 70%, 80%, 90% utilization), making it a more useful tool for cost control and performance evaluation than a static budget.
What is the 'earthday' ?
The next figure is
The missing term of the series isÂ
A2, C5, E8, G11, ____________
In two years, half the tiles fall off from a wall. How many years will it be when 75% of the tiles have fallen off?
The average of first 8 multiples of 8 is.
Which amongst the following statements is/are not correct ?
1.     Isthmus is a narrow strip of land joining two landmasses.
2. �...
Which of the following will complete the adjoining figure
Match List I with List II
Choose the correct answer f...
Match List I with List II
...
A ray of light hits a mirror and is reflected. If the mirror rotates by an angle 10° in one direction, then the reflected ray will rotate by