      Which type of budget is prepared for a range of activity

      levels rather than a single level?
      A Static Budget Correct Answer Incorrect Answer
      B Flexible Budget Correct Answer Incorrect Answer
      C Master Budget Correct Answer Incorrect Answer
      D Capital Budget Correct Answer Incorrect Answer

      Solution

      A Flexible Budget is designed to change or flex with the level of activity. It is prepared for a range of capacities (e.g., 70%, 80%, 90% utilization), making it a more useful tool for cost control and performance evaluation than a static budget.