      The design of diversion ditches for gully control is

      based on the return period of
      A 5-10 years Correct Answer Incorrect Answer
      B 50 years Correct Answer Incorrect Answer
      C 25 years Correct Answer Incorrect Answer
      D 100 years Correct Answer Incorrect Answer

      Solution

      Temporary gully control structures are made up of locally available material and are designed for 3-10 years.