    The design of diversion ditches for gully control is

    based on the return period of
    A 5-10 years Correct Answer Incorrect Answer
    B 50 years Correct Answer Incorrect Answer
    C 25 years Correct Answer Incorrect Answer
    D 100 years Correct Answer Incorrect Answer

    Solution

    Temporary gully control structures are made up of locally available material and are designed for 3-10 years.