Question
A train crosses a 250-metre-long platform in 18 seconds,
and a tunnel 60% longer than the platform in 27 seconds. Find the speed of train in km/h.Solution
Let the length and speed of train be ‘l’ metres and ‘x’ m/s, respectively.
Then, according to question,
(l + 250)/18 = (l + 400)/27
3l + 750 = 2l + 800
l = 50
l = 50 metres
x = (l + 250)/18 = 300/18 ×(18/5) = 60 km/h
 RST Ltd’s has the following information
Sales = 300000
Cost of Goods Sold = Rs 140000
Pre-Interest Operating Expenses =...
Depreciation would be classified as:
Which of the following do not fall under the scope of Cost Accounting?
In which of the following industry, batch costing will be used?
If cost of equity is 15% with weight 1/3 and cost of debt is 10% with weight 2/3, calculate weighted average cost of capital. Rate of tax is 32%?
Who can create a trust under the Indian Trusts Act, 1882? Â
Calculate the Material Price variance, if Material Cost variance is 24000 (F) and the Material Usage variance is 29750 (F).
Which of the following is a technique of inventory management?
Management accounting can assist the management by provision of relevant information for __________
The category of costing which is applicable to work carried out or products produced by specific orders as against continuous production, is known as __...