Question
If A can complete a job in 15 days and B can complete
the same job in 10 days, and they work together for 4 days before A leaves. How many more days will B take to finish the job alone?Solution
A's work rate = 1/15; B's work rate = 1/10. Combined work rate = 1/15 + 1/10 = (2 + 3) / 30 = 5/30 = 1/6. Work done in 4 days = 4 * (1/6) = 2/3. Remaining work = 1 - 2/3 = 1/3. B's time to finish remaining work = (1/3) / (1/10) = (1/3) * 10 = 10/3 = 3.33 days.
Which of the following waves require a medium to travel?
What is the function of a fuse in an electric circuit?
If lift is going up with acceleration, the apparent weight of a body is -
The Pointing vector of electromagnetic waves has the same dimensions as that of:
A particle of mass m is placed in a potential V(x) = ax² + bx⁴. For small oscillations around equilibrium, its time period is:
If a body of mass 5 kg is raised to 10 meters height, find its potential energy. (g = 9.8 m/s²)
A closely wound solenoid 40 cm long has 5 layers of windings of 400 turns each. The diameter of the solenoid is 2 cm. If the current carried is 8.0 A, e...
When white light passes through a glass prism, which color deviates the least?
A beam of light consisting of two wavelengths, 600 nm and 420 nm, is used to obtain interference fringes in a Young’s double-slit experiment. Find...