Question
P is 60% more efficient than Q. P takes 30 more days to
finish a work as compared to the number of days taken by P and Q together to finish the same work. Find the time taken by Q to finish the same work alone.Solution
Let efficiency of P = p and efficiency of Q = q p = 160% of q => p: q = 8: 5 Let time required by P and Q together to finish this job be “t”. (p + q) ×t = W => 13x × t = W …. (1) ATQ- p × (t + 30) = W => 8x × (t + 30) = W … (2) By solving above two equations we get t = 48 13x × 48 = 5x × T => T = 124.8 days
POST stands for ...........
Select the option that is related to the fifth number in the same way as the second number is related to first number and the third number is related to...
Four numbers have been given, out of which three are alike in some manner and one is different. Select the number that is different.
. In the following question, find which one word cannot be made from the letters of the given word “CORRESPONDENCE”
- How many vowels are to the right of 'P'?
All the words arranged as per the dictionary order then which of the following words is third from the right end?
Arrange the words in the alphabetical order and pick the one that come in the end.
Which of the following chips is powered by a battery?
Which box contains maximum candies?
I. Box A has candies more than Box C and Box E but not more than Box B and Box D.
II. The sum of candi...
Select the option that is related to the third term in the same way as the second term is related to first term.
SURPRISE: IRHVHFIK:: HESITATE: ?