Let the total work = 36 units Efficiency of (A + B) = 36/18 = 2 units/day Efficiency of ‘A’ = 36/36 = 1 unit/day Therefore, efficiency of ‘B’ = 2 – 1 = 1 units/day Efficiency of ‘C’ = 1.5 × 1 = 1.5 units/day Required time taken = 36/1.5 = 24 days
What is the mascot of Linux Operating System ?
A Hard Drive is __________
A collection of drawing, diagrams and photograph that you can insert into documents-
The CPU, also called the______ when talking about PC, does the vast majority of the processing for a computer.
Large transaction processing systems in automated organizations use ________.
What type of graphical model is used to define a database?
The electronic path, that connect one part of computer to another is _____
Which of the following feature is not present in PIM?
The lines intersecting on a worksheet both horizontally and vertically are referred to as:
What is the shortcut key for ‘Selecting File Menu’?