‘A’ alone can complete a work in 30 days. ‘B’ alone can complete the same work in 40 days. If ‘A’ and ‘B’ work together for 6 days, then the remaining work can be completed by ‘A’ alone in how many days?
More Quant Miscellaneous Questions
- Train P takes 24 seconds to pass a tree and 34 seconds to pass through a 150-meter-long tunnel. Train Q, which is 440 meters long, takes 17.6 seconds to pa...
- "M' sold a watch to 'N' making a profit of 20%. 'N' then sold it to 'X' at a 10% loss. If 'M' had directly sold the watch to 'X' at a 10% profit instead, h...
- 125% of 88 ÷ 44 × 48 × 8 = ? × √125
- The current ages of A and B are in the ratio of 4:7. Six years from now, the ages of B and C will be in the ratio of 2:3. If the average of the present age...
- Two tangents are drawn from an external point to a circle with radius 8 cm, and the distance between the external point and the center of the circle is 17 ...
- A person spends 40% of his income on rent, 30% on food, and 20% on education. If he saves ₹2000, what is his total income?
- Find the reciprocal of the complex number z = 9 – 4i.
- A pipe fills a cubical tank at the rate of 384 m3 per minute in 36 minutes. If a cylindrical tank having height same as the side of a cubical tank and the ...
- Let A={1,2,3} and a relation R={(1,1),(2,2),(3,3),(1,2),(2,1)}. Which is false about R?
- Amit has two routes, ‘X’ and ‘Y’, to travel from his home to his gym. The length of route ‘X’ exceeds the length of route ‘Y’ by 15 km. On Monday, Amit cho...
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt
Think You're Ready for RBI Grade B?
RBI Grade B 2026 Phase 1 Memory Based Paper
- 200 Questions with Detailed Solutions
- Section-wise Coverage (GA, English, Quant & Reasoning)