Question
‘A’ alone can complete a work in 30 days. ‘B’
alone can complete the same work in 40 days. If ‘A’ and ‘B’ work together for 6 days, then the remaining work can be completed by ‘A’ alone in how many days?Solution
Let the total amount of work = 120 units {LCM of 30 and 40} Then, efficiency of ‘A’ = 120/30 = 4 units/day Efficiency of ‘B’ = 120/40 = 3 units/day Combined efficiency of ‘A’ and ‘B’ = 4 + 3 = 7 units/day Work completed by ‘A’ and ‘B’ together in 6 days = 7 × 6 = 42 units Remaining work = 120 – 42 = 78 units Time taken by ‘A’ alone to complete the remaining work = 78/4 = 19.5 days
Which of the following potential is always negative?
In CRD design the degree of freedom for error is calculated by which formula?
Marconi wheat is known as:
Which crop is called 'camel crop"?
The synthesis of ATP via electron flow through the ETS, with oxygen as the terminal electron  acceptor,   is  known...
According to latest Final estimates of Foodgrain production 2023-24, Which state is the largest producer of sugarcane in India?
Tikka disease of groundnut spreads fast under the conditions of:
Pradhan Mantri Krishi Sinchai Yojana (PMKSY) was launched in the year___
What is the meaning of the word "Chrysanthemum," as derived from its etymology?
Of which South-East-Asian country did Joko Widodo become the President in 2019 for the second time?