Question
‘A’ and ‘B’ can do a piece of work in 18 days and 25 days, respectively. They started working together but ‘A’ left after 9 days. Find the time taken by ‘B’ to complete the remaining work.
More Alligation Questions
- If (x - 5)2 - (x + 5)2 = 0, then what is the value of 'x'?
- How much groundnut powder at Rs. 90 a kg. should be added to 56 kg. of cashew powder at Rs.310 a kg. so that by selling the mixture for Rs. 280 a kg, a p...
- 12, 13, 22, 47, 96, ?
- In what ratio rice at 34 Rs/kg should be mixed with the rice at 27 Rs/kg so that selling mixture at Rs 39 per kg gives the profit of 30% if the quantity of...
- Pipe ‘A’ can fill a tank in 16 hours whereas leak ‘A’ can empty it in 20 hours. If they both operate along with pipe ‘B’, then the given tank gets filled i...
- (0.25) -1.5 = ?
- A petrol pump has a blend of 40 liters of petrol and diesel in the ratio of 5:3. After selling 16 liters of the mixture, 12 liters of petrol are added to t...
- 4, 14, 44, 134, ?, 1214
- A container contains a mixture of wine and water in the ratio of 4:1. 150 litres of the mixture was taken out and 50 litres of water was added to it. If th...
- A shopkeeper has 60 kg rice a part of it, he sells at the profit of 30% and rest at loss of 10% and he get the loss of 8% so what is the quantity sold at t...
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt
Think You're Ready for RBI Grade B?
RBI Grade B 2026 Phase 1 Memory Based Paper
- 200 Questions with Detailed Solutions
- Section-wise Coverage (GA, English, Quant & Reasoning)