Question
A alone can complete 50% of a work in 15 days while B
takes 10 days more than A to complete it. If B and C together can complete the work in 20 days, then find the time taken by C alone to complete the same work.Solution
Time taken by A alone to complete the entire work = 15/0.5 = 30 days Time taken by B alone to complete the entire work = 30 + 10 = 40 days Let the total work = L.C.M of 30, 40 and 20 = 120 units Then, efficiency of B = (120/40) = 3 units/day Combined efficiency of B and C = (120/20) = 6 units/day So, efficiency of C alone = 6 – 3 = 3 units/day So, time taken by C alone to complete the entire work = (120/3) = 40 days
A cone has a base radius of 6 cm and a height of 8 cm. Find its volume and slant height (use π = 3.14).
120Â Â 124Â Â 151Â Â 167Â Â Â 292Â Â Â ?
Factor the polynomial: x³ - 6x² + 11x - 6.
What is the function of the "IF" function in Excel?
The simplified value of (452 x 452 x 452 – 356 x 356 x 356)/(452 x 356 + 452 x 452 + 356 x 356) is:
A bag contains 8 black and 10 white balls. One ball is drawn at random. What is the probability that the ball drawn is white?
In the figure, ABCD is a cyclic quadrilateral with O as center of the circle If ∠BOC = 136°, find ∠OBC.