Question
A and B together can complete a piece of
work in 42 days while B and C together can complete the same work in 50 days. All of three together can complete 80% of the whole work in 26.4 days then find the time taken by A and C together to complete the whole work. Note: You have to find approx. valueSolution
What does ACID stand for in the context of database transactions?
The time required to delete a node x from a doubly linked list having n nodes is
Which SQL keyword is used to remove rows from a table?
What is the function of a web server in web technology?
The SI unit for measuring temperature is:
Which network layer protocol provides a reliable, connection-oriented delivery of packets?
What is the primary purpose of a database transaction?
In a CSS file, there is a CSS rule for paragraphs tags β what does p can be called?
What is the purpose of the β
The result evaluating the postfix expression 10 5 + 60 6/ * 8 β is