The efficiency of A,B,C,D are in the ratio of 6:5:4:3. If A and C can do a work together in 6 days. Then How many days B and D will take to complete the same work?
Let A can do 6 units per day then C can do 4 units per day So days taken by (A+C) together to complete the work = 6 days So total work = (6+4)*6 = 60 units Efficiency of (B+D) = (5+3) = 8 So B & D will do this job in = 60/8 = 7.5 days
The cost of fencing a rectangular field at the rate of Rs. 5/metre is Rs. 330. If the length of the field is 11 metres more than its breadth, then find ...
Each side of square ‘A’ is 4 cm less than that of square ‘B’. The perimeter of a rectangle is 3 times the difference of the perimeters of the tw...
PQRS is a rectangle. T is a point on PQ such that RTQ is an isosceles triangle and PT = 5 QT. If the area of triangle RTQ is 12 √3 sq.cm, then the ar...
If √̅1̅2̅-̅2̅√̅3̅5̅ + √̅8̅+̅2̅√̅1̅5̅ = √a + √b, where a and b are positive integers, then the value o...
When the ratio of the length and breadth of the rectangle is given as 3:2. If the perimeter of the rectangle is equal to the perimeter of the square, wh...
The ratio of the breadth to the length of a rectangular field is 3:4. The total cost of cutting the grass of the field at the rate of Rs 12 per m2<...
The volume of cone is 1689.6 cm3. If its height is 2.8 cm then find the radius of the cone.
The average cost of two chairs is Rs. 15000. The average cost decrease by 30% when one more chair is included. What is the cost price of the 3 rd <...
Find the surface area of the smallest cube that can perfectly fit a sphere of volume 972π cm3 inside it.