Question
A can complete a task in 20 days, and B can complete the
same task in 25 days. If A works for 6 days and then leaves, in how many days will B complete the remaining work?Solution
Work done by A in 6 days = 6 × (1/20) = 3/10. Remaining work = 1 - 3/10 = 7/10. Time taken by B = (7/10) ÷ (1/25) = 17.5 days. Correct option: d
- How far will 'Arjun' travel by the time he catches up to 'Rohan', given that 'Arjun' starts 150 km behind and moves at 55 km/h while 'Rohan' moves at 35 km...
- A car is 2,400 metres ahead of a truck when the truck starts chasing at a speed of 32 m/s. The car is moving at 24 m/s. How much time will the truck take t...
A train covers a certain distance at a speed of 24 km/h and the next same distance with a speed of 30 km/h and the next same distance with a speed of 40...
A train leaves a station and travels for 4 hours at a speed of 80 km/h. It then increases its speed to 100 km/h for the next 3 hours. What is the total ...
On travelling with 30% less speed than his actual speed, Arjun reached the destination 2 hours late. Find the approximate time taken by him to reach his...
A bus driver drives at 45 km/h and is supposed to reach in 2 hours. He stops for 30 minutes after halfway. What speed is needed for the rest of the trip?
Travelling at a speed of 54 km/h, Chaman reaches a place 3 minutes early. If he had travelled at a speed of 48 km/h, he would have been 1 minute late. W...
A,B and C run around a Circular track starting from the same point simultaneously and in the same direction at the speed of 16 kmph, 24 kmph and 32 kmph...
A cyclist is 1,200 metres ahead of a motorbike when the motorbike starts chasing at 25 m/s. If the cyclist is riding at 15 m/s, then find the time take...
- Two cars ‘X’ and ‘Y’ start from cities ‘M’ and ‘N’ respectively towards each other at the same time. The distance between cities ‘M’ an...