Start learning 50% faster. Sign in nowWork done by the first man in 5 days = 5/12. Remaining work = 1 - 5/12 = 7/12. Work done by the second man in one day = 1/18. Days taken by the second man = (7/12) / (1/18) = 7/12 × 18 = 10.5 days. Answer: c) 10.5 days.