Question
A and B together can complete a task in 12 days. B alone
can complete it in 20 days. How long will it take A to complete the task if he works alone?Solution
Let the total work be 1 unit of task. Work rate of A and B together = 1/12 units per day Work rate of B alone = 1/20 units per day Work rate of A alone = 1/12 − 1/20 = (5 − 3) / 60 = 2/60 = 1/30 units per day Therefore, A alone will complete the task in 30 days. Correct answer: a) 30 days
If in a ΔABC, AD is internal angle bisector & D is a point on BC, AB = 6cm, BC = 9cm then what is BD:CD?
A right triangular pyramid XYZB is cut from cube as shown in figure. The side of cube is 16 cm. X. Y and Z are mid points of the edges of the cube. What...
If in a ΔABC, AD is internal angle bisector & D is a point on BC, AB = 3cm, BC = 5cm then what is BD:CD?
In the given Figure, Find  angle BCD. If AB is a diameter & AB is parallel to CD.
If I is the incentre of ΔABC , if ∠BAC = 750 , then what is the measure of ∠BIC?
Find the area of triangle having sides in the ratio 2:4:5 & the perimeter of the triangle is 22 cm
In ABC,D is a point on side AB such that BD = 2 cm and DA = 3 cm. (E is a point on BC such that DE) AC, and AC = 4 cm. Then (Area of A BDE) : (Area of ...
The radius of a circle is 25 cm, and the length of the chord is 14 cm. Find the distance between the chord and the centre of the circle. Â
The area of an equilateral triangle is 36√3 sq m. Its perimeter isÂ