Start learning 50% faster. Sign in now
Let the total work be 1 unit. Druv's 1-day work = 1/60 Advesh and Pavan together: 1-day work = 1/20 Advesh alone does the same work as Pavan and Druv together, so: Advesh's 1-day work = Pavan's 1-day work + Druv's 1-day work Let Pavan's 1-day work = P Then Advesh's 1-day work = P + 1/60 So, P + (P + 1/60) = 1/20 2P + 1/60 = 1/20 2P = 1/20 - 1/60 = (3 - 1)/60 = 2/60 = 1/30 P = 1/60 So, Pavan alone can do the work in 60 days.
LDPE has maximum heat resistance of
The nematodes, as a rule, are bisexual existing as separate:
Lumpi-Pro VacInd, a vaccine for Lumpy disease of cattle has been developed by ____
What is the average droplet size range in an Ultra Low Volume (ULV) sprayer?
Which of the following bacterial genera is a common cause of soft rot in plants?
What is the subsidy for 15 hp mb plough for SC/ST women according to NABARD
How much concentrate is fed to Cross bred exotic 5 months pregnant cattle other than maintenance?
Quincunx system accommodates how much more plants than square system of planting?
What is the full form of SoFTeL?