Question
Pipe X and Pipe Y can independently fill a tank in 18 minutes and 30 minutes, respectively. However, there is a leakage in the tank that causes water to flow out at a rate of 2 liters per minute. How long will it take to fill the tank if both pipes and the leakage operate simultaneously?
More Pipes and cisterns Questions
- Tap P can fill a tank in 18 hours, while tap Q can do it in 9 hours. If taps P, Q, and R are opened at the same time, how long will it take to fill the tan...
- Pipe A and pipe B can fill the empty tank in 18 hours and 30 hours respectively, whereas pipe C can empty the full tank in ‘x’ hours. Find the value of ‘x’...
- If a tank can be filled by a tap in 16 hours, but due to an outlet, it actually takes 4 hours longer to fill the tank, find the duration in which the outle...
- Pipes 'X' and 'Y' can fill a tank in 30 minutes and 45 minutes respectively. Both are opened together. After the tank is half full, a leak develops which d...
- A tank can be filled by two pipes, A and B, in 15 minutes and 20 minutes, respectively. Both pipes are opened together, but after 5 minutes, pipe A is clos...
- Pipe A alone fills a tank in 18 hours. Pipes A and B together fill it in 12 hours. Pipes B and C together fill it in 9 hours. Find the time taken by A, B a...
- An inlet pipe 'A' can fill a tank in 'x' minutes while an outlet pipe 'B' can empty the fully filled tank in (x - 4) minutes. If both are opened together, ...
- Pipe ‘A’ takes 15 minutes to fill a tank. Pipe ‘B’ takes 20 minutes to empty the same tank. If pipe ‘B’ is opened 12 minutes after pipe ‘A’, then find the ...
- Time taken by a tap to fill a tank is 8 hours. If the time taken by tap to fill the tank gets doubled due to a leakage in the tank, then find the time take...
- Pipe 'A' is twice as efficient as pipe 'B'. Pipe 'C', which is one-third as efficient as pipe 'B', can fill a tank alone in 27 hours. Find difference betwe...
Relevant for Exams:
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt
Think You're Ready for RBI Grade B?
RBI Grade B 2026 Phase 1 Memory Based Paper
- 200 Questions with Detailed Solutions
- Section-wise Coverage (GA, English, Quant & Reasoning)