Question
Pipe ‘A’ can fill a tank in 30 hours whereas leak ‘A’ can empty it in 40 hours. If they both operate along with pipe ‘B’, then the given tank gets filled in 15 hours. How much time is needed to fill the given tank if pipe ‘B’ and leak ‘A’ work together?
More Pipes and cisterns Questions
- Pipe ‘A’ and pipe ‘B’, together can fill 20% of a tank in 5 hours while pipe ‘C’ takes 37 hours to empty it. Pipe ‘A’ and pipe ‘B’ were opened together. Af...
- Pipe ‘A’ can fill 25% of a tank in 3 hours while pipe ‘B’ takes 30 hours to empty fully filled tank. Pipe ‘A’ is opened alone when the tank was empty. Afte...
- Pipe 'X' is capable of emptying a tank in 15 hours. When Pipe 'Y', which adds 2.4 liters of water per hour, is also used, it takes 25 hours to empty the ta...
- Pipe A can fill half of the tank in 6 hrs 2 min- Pipe B can fill the same tank completely in 18 hrs 5 min while pipe C can empty the fully filled tank in 9...
- Tap 'A' can fill a tank 'X' in 16 minutes while it takes 24 minutes when there is a leakage tank 'Y'. If tap 'B' is 33(1/3)% less efficient than tap 'A', t...
- Pipe A can fill a tank in 50% less time than it takes pipe B to empty it, while pipe C can fill the same tank in 25% less time than pipe B's emptying durat...
- Pipe 'A' fills half tank in 25 minutes. Pipe 'B' is 3 times as efficient. What percentage of the tank is filled by both in 10 minutes?
- Pipes A and B can fill a tank in 12 hours and 16 hours respectively, while pipe C can empty the full tank in ‘x’ hours. If all three pipes are opened toget...
- Pipe A and B can fill the pool in 20 minutes and 24 minutes, respectively. Pipe C can empty half filled pool in 20 minutes. If all the pipes are opened tog...
- Three pipes A, B and C can fill a tank in t, (t+12) & (t-12) hours respectively. Pipe A opened for d hours in the tank and after that B and C also opened i...
Hey! Ask a query
Please enter email id
The email must be a valid email address.
Please enter Mobile Number
Please enter valid Mobile Number
Please enter your Doubt
Think You're Ready for RBI Grade B?
RBI Grade B 2026 Phase 1 Memory Based Paper
- 200 Questions with Detailed Solutions
- Section-wise Coverage (GA, English, Quant & Reasoning)