Question
The ratio of volumes of spheres A and B is 8:27. If the
difference between their total surface area is 3080 cm² then find diameter of sphere A. (in cm)Solution
ATQ,
Volume ratio A:B = 8:27 → radii ratio = 2x : 3x Surface area of A = 4π(2x)² = 16πx² Surface area of B = 4π(3x)² = 36πx² Difference = 36πx² – 16πx² = 20πx² = 3080 Solve: 20πx² = 3080 x² = 3080 / (20 × 3.1416) ≈ 49 x = 7 Radius of A = 2x = 14 Diameter = 2 × radius = 28 cm
(x + 7) workers finish 60% of a job in 9 days working 4 hours/day. The remaining work is done by (x + 3) workers in 12 days working 3 hours/day. Find x.
- ‘A’ can complete a job in 36 days. ‘B’ takes 3 times as long as ‘A’ to finish the same job. If both work together, how much of the work will th...
- Varun and Arnav can finish a work in 28 days and 56 days respectively when working alone. Varun starts first. In how many days should Arnav join him so tha...
- A builder employed 12 workers to complete a job in 18 days. But after 8 days, 4 workers quit. How many more days will be required to complete the remaining...
24 male working 12 hours per day can finish a piece of work in 30 days, while 36 female working 8 hours per day can finish the sa...
A can complete a work in 30 days. B takes 6 days less than A to complete the same work. In how many days can both of them together complete 60% of the w...
Ravi can finish a task in 18 days. If Ravi and Rohan work together, they can complete the task in 10 days. How many days would Rohan alone take to finis...
An elephant can do a work as fast as two horses ‘A’ and ‘B’ can do it by working together. If horse ‘A’ alone can complete the work in 38 ho...
- Together, Ali and Imran take 40 days to complete a project. After working jointly for 32 days, they left, and Zara completed the remaining work in 4 days. ...
A and B together, B and C together and A and C together can complete a piece of work in 10 days, 14 days and 18 days respectively. Find the ratio...