Question
The total area of a square and a rectangle is 306 cm².
The breadth of the rectangle is 6 cm more than the length of each side of the square. If the length of the rectangle is 18 cm, then what is the difference between the perimeters of the rectangle and the square?Solution
ATQ,
18(x + 6) + x² = 306 Or, x² + 18x + 108 – 306 = 0 Or, x² + 18x – 198 = 0 Or, x² – 9x + 27x – 198 = 0 Or, x(x – 9) + 22(x – 9) = 0 Or, (x – 9)(x + 22) = 0 Or, x = 9, -22 Since the side cannot be negative, x = 9 Breadth of rectangle = x + 6 = 15 cm Perimeter of rectangle = 2(15 + 18) = 2 × 33 = 66 cm Each side of the square = x = 9 cm Perimeter of square = 4 × 9 = 36 cm Required difference = 66 - 36 = 30 cm
A alone can do a piece work in 15 days and the time taken by A alone is 50% more than the time taken by B. They started work together alternatively star...
‘X’ can complete a job in 30 days. ‘Y’ is 50% more efficient than ‘X’. How long will they take to finish 75% of the work together?
...Vijay can do a piece of work in 32 days and Sanjay can do the same work in 48 days. If Vijay works for 2 days and got Rs. 960, and the remaining work wi...
A can fabricate a divider in 10 days , while B alone can assemble it in 30 days, If they construct it together and get an installment of Rs 8200, then f...
‘A’ and ‘B’ alone can do a certain work in 30 days and 40 days, respectively. Both started the work together but after ‘x’ days ‘A’ left...
Raju and Raman can complete a piece of work in 12 days and 16 days, respectively. If they work on alternate days, starting with Raju, in how many days w...
P alone can finish a piece of work ‘M’ in 8 days while Q takes 4 days to finish it alone. P, Q and R working together can finish the work ‘N’ wh...
‘A’ and ‘B’ can do a piece of work in 20 days and 30 days, respectively. If they started the work together and worked on it for 7 days, then fin...
A, B, and C are hired to complete a task. A and B together can finish the work in 12 days, B and C together in 15 days, and A and C together in 20 days....
- Person 'X' can finish a task in 40 days while 'Y' can do it in 50 days. How long will it take if both work together?