Question
Inside a square land having perimeter equal to 76
metres, leaving aside a circular land of radius 7 metres, the remaining land needs to be levelled at a cost of 14 rupees per square metre. What is the cost of leveling?Solution
Let the length of each side of the square land = βxβ metres Then, perimeter of the land = 4x = 76 metres So, x = (76/4) = 19 So, area of the square land = x2 = 192 = 361 m2 Area of the circular land = Ο Γ radius2 = (22/7) Γ 7 Γ 7 = 154 m2 Therefore, area to be levelled = 361 β 154 = 207 m2 Cost of leveling = 207 Γ 14 = Rs. 2898
X can work as fast as Y and Z together. X and Y together can finish the same task 3 times as fast as Z. If all three working together can finish the tas...
A and B together can complete a piece of work in 55 days while B and C together can complete the same work in 66 days. All of three togeth...
Priya and Meena alone can complete a project in 54 days and 81 days respectively. They work together and earn Rs. 9,100. Find the share of Priya.
Sachin can complete a job in 15 days. Ankit alone can complete the same job in 10 days. Sachin works for 9 days and then the remaining job is completed ...
25 men can complete a piece of work in 13 days. One man starts the work and after every day one more man joins the work and this continues till the work...
P and Q together can complete 75% of a work in 15 days while Q alone takes 40% more time than P and Q together to complete the whole work. Find the time...
Asmita and Bhanu working together can complete the task in ____ days, and the efficiency of Sam is 50% more than that of Asmita. Bhanu alone can complet...
βPβ can complete a project in 12 days. βQβ is 40% less efficient than βPβ. Working together, βPβ, βQβ and βRβ can finish the job...
A buffalo alone can plough field βAβ in 30 days. A Bull alone can plough the field βAβ in 50 days. Find the number of days taken by 2 bulls and ...
36 workers are digging a tunnel 5 km long. After working for 20 days, only 2/3 of the tunnel is completed. Then 4 more workers join the team. How many d...