Question
A, B, and C can complete a piece of work separately in
10, 20 and 40 days, respectively. In how many days will the work be completed if A is assisted by both B and C every third day?Solution
AÂ Â Â Â Â Â Â Â Â Â Â Â BÂ Â Â Â Â Â Â Â Â Â Â Â C 10Â Â Â Â Â Â Â Â Â Â 20Â Â Â Â Â Â Â Â Â Â 40 Â Â Â Â Â Â Â Â Â Â Â Â Â Â 40Â Â Â Â Â Â Â Â Â Â Total work 4Â Â Â Â Â Â Â Â Â Â Â Â 2Â Â Â Â Â Â Â Â Â Â Â Â 1Â Â Â Â Â Â Â Â Â Â Â Â Efiici The work of first 3 days =4+4+(4+2+1) =15units Similarly, the Next 3 days work=15units After 6days remaining work =40-(15+15) =10units 7days by A=4unit 8days by A=4units 9 days by A, B, C=2/7 Total days=8+2/7=58/7days.
What does Polymorphism mean in the context of OOP?
What is the purpose of a heuristic function in AI search algorithms?
In a nodal analysis a circuit with 10 nodes will have _______ unknown voltage and _______equation.Â
Which heuristic search strategy uses both cost so far and estimated cost to goal?
Consider the following C code snippet designed to calculate the sum of digits of a non-negative integer:
  #include
  in...
A C function insert(Node* root, int data) for a BST.
#include
typedef struct Node {
  int data;
  struct ...
What is the main drawback of the Minimax algorithm?
A system uses paging with a logical address space of 2^26 bytes and a page size of 4 KB. How many bits are required for the page number in the logical a...
The kelvin double bridge is used for______
You encounter a bug that only appears intermittently and is difficult to reproduce. What is this type of bug often called?