Question
According to Code 50 of the Occupational Safety, Health
and Working Conditions Code, 2020, what action can be taken if a contractor fails to give intimation about receiving a work order from an establishment?Solution
Ans. b, As per Code 50. (1) When a contractor receives work order from an establishment either to supply contract labour in the establishment or to execute the contract through contract labour in the establishment he shall, within such time and in such manner as may be prescribed, intimate to the authority referred to in section 119. (2) Where the contractor fails to give intimation under sub-section (1), the designated authority may, after giving the holder of the licence an opportunity of showing cause, suspend or cancel the licence in such manner as may be prescribed by the appropriate Government.
The entire length of 256.551 km from Gomoh (Nimiaghat) to Sonnagar (Chiraila Puthu) of the dedicated freight corridor network has been divided into ____...
What is the name of the AI-powered system launched by Indian Railways for inspecting and sorting linens?
Which railway station holds the Guinness World Record for the largest route relay interlocking system?
As on 31 March 2011, the total route length of the broad gauge of the Indian Railways was:
Which system is most suitable for bridges and large-scale structures?
The clear ________ distance between the inner (running) faces of the two rails forming a track is known as gauge.
What is the name of the initiative to improve safety in Indian Railways?
_______ private companies incorporated in Britain constructed and managed the early trunk lines in India.
How many route kilometres of Indian Railways are electrified as per the data till 2024?
The first steam locomotive, No. F-734, was built in 1895 by the _____ workshop of the Rajputana—Malwa Railway.