Question
The Pradhan Mantri Gram Sadak Yojana (PMGSY) focuses on
providing all-weather road connectivity to rural areas. What is the minimum population requirement for villages in hilly and desert areas to be eligible for road connectivity under PMGSY?Solution
Under PMGSY, villages in hilly, tribal, and desert areas with a minimum population of 250 people are eligible for all-weather road connectivity.
Tap A can fill a tank in 15 hours. Tap B can fill 12.5% part of the same tank in 2 hours, whereas Tap C can alone empty a tank in ‘x’ hours. 5/8 par...
- Tap 'A' can fill a tank 'X' in 36 minutes while it takes 54 minutes when there is a leakage tank 'Y'. If tap 'B' is 33(1/3)% less efficient than tap 'A', t...
Pipes 'X' and 'Y' can fill a tank in 30 minutes and 45 minutes respectively. Both are opened together. After the tank is half full, a leak develops whic...
A single tap takes 12 hours to fill the entire tank. Initially, only one tap is open, and it fills half of the tank. At that point, four additional iden...
A, B and C are three pipes connected to a tank. A and B together fill the tank in 30 hours, B and C together fill the tank in 40 hours. A and C together...
Tap A is 100% more efficient than tap B. Both the taps together can fill the tank in 10 hours. Find the time taken by tap C, which is 25% more efficient...
Pipe A fills a tank in 10 hr, Pipe B in 15 hr, and Pipe C empties in 30 hr. All open together. Time to fill?
Pipe A can fill a tank in 6 hours, and Pipe B can fill it in 8 hours. Pipe C can empty the tank in 10 hours. If all three pipes are opened simultaneousl...
Pipe 'A' fills half tank in 14 minutes. Pipe 'B' is 4 times as efficient. What % of the tank will be filled by both in 4 minutes?
Tap A and Tap B fill a drum of volume 483 liters in 21 minutes. If their efficiencies are in the ratio x:y respectively and B alone takes to fill the ci...