Question
Phase-I of the Ahmedabad Metro project that was recently
flagged off by PM Narendra Modi comprises about _____km of the East-West corridor from Apparel Park to Thaltej and the North-South corridor between Motera to Gyaspur?Solution
Prime Minister Narendra Modi waved the green flag for the Ahmedabad Metro Rail Project. The Ahmedabad Metro Rail Project is a monumental boost to multimodal infrastructure connectivity. Phase-I of the Ahmedabad Metro project comprises about 32 km of the East-West corridor from Apparel Park to Thaltej and the North-South corridor between Motera to Gyaspur. The Thaltej-Vastral route in the East-West corridor has 17 stations. This corridor also has a 6.6 km underground section with four stations. The 19 km North-South corridor that connects Gyaspur to Motera Stadium has 15 stations. The entire Phase 1 project is built at a cost of more than ₹12,900 crores. About Gujarat Capital: Gandhinagar Chief minister: Bhupendrabhai Patel Governor: Acharya Devvrat
In a certain code language ‘SUPREME’ is written as ‘QVTRFNF’ and ‘AGENT’ is written as ‘HBEUO’. How is ‘GAMER’ written in that cod...
In a certain code language, '2, 4, 6' means 'object for required'; '6, 3, 5, 2' means 'circular for motion required' and '3, 7, 4, 1' means 'object smal...
In a certain code language ‘SHOWERS’ is written as ‘PITWTSF’ and ‘KEYWORD’ is written as ‘ZFLWESP’. How...
If 144 C 12 = 12 and 180 C 9 = 20, then 256 C 16 = ?
The position of how many alphabets will remain unchanged if each of the alphabets in the word ‘FASCINATION’ is arranged in alphabetical order from l...
What is the symbol used in the word 'clipboard'?
What is the code for ‘under recruited’?
- If "TIME" is coded as 25 and "GAME" is coded as 12, what will be the code for "FAST"?
If ‘DEFINE’ is coded as '18', ‘CLUSTER’ is coded as '42', then what is the code for 'PROGRAM' in the same code language?
In a certain code language ‘FRAUD’ is coded as ‘20’ and ‘MANUAL’ is coded as ‘50’ then ‘BARREN’ will be coded as ____ in the same co...