Phase-I of the Ahmedabad Metro project that was recently
flagged off by PM Narendra Modi comprises about _____km of the East-West corridor from Apparel Park to Thaltej and the North-South corridor between Motera to Gyaspur?Solution
Prime Minister Narendra Modi waved the green flag for the Ahmedabad Metro Rail Project. The Ahmedabad Metro Rail Project is a monumental boost to multimodal infrastructure connectivity. Phase-I of the Ahmedabad Metro project comprises about 32 km of the East-West corridor from Apparel Park to Thaltej and the North-South corridor between Motera to Gyaspur. The Thaltej-Vastral route in the East-West corridor has 17 stations. This corridor also has a 6.6 km underground section with four stations. The 19 km North-South corridor that connects Gyaspur to Motera Stadium has 15 stations. The entire Phase 1 project is built at a cost of more than ₹12,900 crores. About Gujarat Capital: Gandhinagar Chief minister: Bhupendrabhai Patel Governor: Acharya Devvrat
Which of the following element has the highest melting point?
Respiration in the absence of air is called
During the fermentation of sugar, the compound which is always formed is…………?
The pH of blood is primarily regulated by:
Which of the following gas is used in the preparation of the bleaching powder?
A sulphide ore is converted into metal oxide by which of the following process?
When a monochromatic light of frequency less than the threshold frequency is incident on a metal surface, which of the following occurs?
When body is accelerated:
Which vitamin is essential for blood clotting?
Indian Institute of Science, Bangalore was founded byÂ